“Our project manager was exceptional, and we built a strong friendship from the start. The integrity, attention to detail and accessibility of everyone we dealt with at Davie Construction Co. was fantastic. For 18 months they worked with us to make sure that there was no interruption or inconvenience to congregants during funerals, weddings, worship services or other church business that couldn’t be stopped for construction. In the middle of the project we had a downpour that flooded a 57-year old three-story building on our campus. I believe it was divine intervention that placed our project manager there that day. He helped throughout the aftermath, even planning the demolition when it was identified as an unfit habitat by the building inspector.\r\n\r\nOur new church is as aesthetically beautiful as the premier assembly building in Mocksville. But even more important to our congregation, it provides us with flexibility that allows us to gather our flock in new ways. Our great room gives us the space to feed children while their parents worship and seniors engage in Bible Study. The ADA accommodations have literally changed the lives of those whose access to the church was previously limited. We are grateful to Davie Construction Co. for making our dream for our new church building come true in every way.”
Shane Nixon, Pastor
412 N. Main Street
Mocksville, NC 27028